Sprint 0 tasks
This is a list of preparation tasks which might be useful for Scrum fresh start.
• Defining Scrum Team.
• The Product’s pre sales estimation is already handy.
• The stake holders are aware of Agile and Scrum.
• Delivery In charge / Client Servicing if required is in place and understands the product.
• Metrics to monitor the product progress in terms of monthly reporting is being decided depending on the Fix Cost – Fix Scope or Managed Team model.
• DevOps or Architecture team is available when required, such teams would be available in initial Architecture / Environment finalization.
StakeHolder’s Vision Call
• A direct call with the Stakeholders, so that everyone on board should be introduced to the Stakeholders.
• Profile if required should be shared with the Stakeholders.
Infrastructure preparedness
Depending on the requirement of the product environments & tools need to be setup.
• A Typical Environment Structure would be. 1 DEV + 1 STAGING / DEMO + 1 Production
• Tools like JIRA / Confluence / Stash needs to be setup depending on the scale of the product.
• Communication Tools like Dropbox / G Drive + Slack needs to be setup as well for swifter and Faster Communication
• If client needs to monitor Epic level progress on some other tool then Asana / Trello can be used.
• Calendar Invites via Google / Outlook is a must.
Architecture and other tasks: –
• Application architecture should be in place.
• Server architecture should be in place.
• Database architecture should be defined.
• Database recovery and daily back up plan should be in place.
• If cronjob’s are to be used then their architecture should be defined.
• Disaster recovery should be in place.
Scrum Preparedness
• It is assumed that the selected team is already aware of Scrum and Agile and shall easily follow the processes required.
• If they are not then they shall be trained by the scrum master.
• A Proper Sprint Calendar is prepared in which the following is finalized
• Sprint Length
• Timing of different meetings (Sprint Planning & Sprint Review) along with the Stake holder is finalized so that there is no to and fro for the meetings.
• Team finalizes the Days for Sprint Start and Sprint End.
Definition Preparedness
In order to avoid misunderstanding and discontented clients it is important to finalize certain
definitions well in advance
• Definition of done
• Definition of Ready
• Coding Standards
• Initial Architecture / Server Configurations / Application or Frameworks
• Test Strategy (Manual / Automation)
RoadMap Clarity
It is important to have a discussion on roadmap along with the team to give the team a bigger picture which shall keep the team motivated and excited about the product. This needs to be done by the Stake holders along with the Product Owner
Release Plan Discussion
• Based on the initial scope a high level Epics needs to be planned and entered in the JIRA for further discussion
• These Epics needs to be Estimated at the epic level to know what is the estimated size of the first release
• Depending on the team strength and their velocity an approximate Release date needs to be finalized and it should be communicated to the team.
Product Backlog Creation
• The High level Epics needs to be prioritized whether they are technical (framework installation or DB design) or business epics or features
• Epics for the first and the second sprint needs to be groomed into multiple stories so that they can be estimated at the story level as well.
• These stories also need to be prioritized depending on the dependency as well as business value.
• The Grooming of these stories are important to start the Sprint 1.